Home / Civil Engineering / Water Resources Engineering :: Discussion

Discussion :: Water Resources Engineering

  1. For efficient working of a control meter, its throat length is approximately kept

  2. A.
    equal to the critical depth
    B.
    twice the critical depth
    C.
    three times the critical depth
    D.
    four times the critical depth.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question. Let us discuss.