Home / Civil Engineering / Water Supply Engineering :: Discussion

Discussion :: Water Supply Engineering

  1. Critical time for developing a water hammer, is the time required for

  2. A.
    closing the valve
    B.
    the wave to travel from valve to the reservoir
    C.
    the wave to travel from the valve to the reservoir and back
    D.
    none of these.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment