Home / Civil Engineering / Water Supply Engineering :: Discussion

Discussion :: Water Supply Engineering

  1. Yield of a drainage basin is :

  2. A.
    run off of the area expressed as instantaneous rate
    B.
    average run off over a short period
    C.
    total volume of water flowing annually
    D.
    all the above.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment