CSE MCQs :: SAP QM
- You want to record defects in inspection lot processing. In the Implementation Guide (IMG), which elements can you combine in a defect report type?
- The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
- Which type of task list defines process steps independently of the inspection lot?
- During an audit, you document a finding. In the audit structure, what can link an audit and a quality notification?
- With reference to Multiple Specifications in Inspection Planning, which of the following statements are true?
- Which is true regarding physical-sample drawing
- QMP means
- The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
A.
Multiple specifications must be stored in an inspection plan
|
B.
You cannot create multiple specifications using the Engineering Workbench (EWB)
|
C.
You can create the multiple specifications in a new inspection plan, but not on an existing inspection plan
|
D.
You need to define object types permitted for multiple specifications, but not objects for each object types
|
A.
Physical-sample drawing can be subject to a separate confirmation process using a sample scheme
|
B.
Physical-sample drawing cannot be subject to a separate confirmation process as it is integral part of the whole process
|
C.
Physical-sample drawing can be subject to a separate confirmation process using a status scheme
|
D.
No separate confirmation process can be applied to physical-sample drawing unless and until it is a failed case
|