Home / CSE / Automation System :: Section 5

CSE :: Automation System

  1. The integrated circuit:

  2. A.
    often is called a "chip"
    B.
    led to the development of the transistor
    C.
    has revolutionized electronics
    D.
    (b) and (c)
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. What is offset error?

  4. A.
    the difference between the sensor input and the absolute sensed parameter.
    B.
    the difference between the controller output and the setting of the manipulated variable.
    C.
    the difference between the control setpoint value and the actual value.
    D.
    All of the above
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Which of the following may be classified as an automation system?

  6. A.
    automated warehouses
    B.
    numerically controlled machine tools
    C.
    robotics
    D.
    All of the above
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. The accuracy of a pick-and-place robot can be as good as:

  8. A.
    + 0.0005 inches
    B.
    + 0.05 inches
    C.
    0.008 inches
    D.
    + 3%
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. The difference between CAD and CAM is that CAD software is directed at product design while CAM software is:

  10. A.
    concerned with production and control of tool design
    B.
    concerned with management programs
    C.
    designed for communications
    D.
    specifically for PC-board design
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. Localizing an object in an image and selectively analyzing the object in a series of redundant layers is referred to as the:

  12. A.
    Turing test
    B.
    pyramid
    C.
    Gaussian pyramid
    D.
    Maxwell pyramid
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. In the operation of a programmable controller:

  14. A.
    all of the logic status is maintained in memory
    B.
    any latched data must be done using an external latching relay
    C.
    mathematics cannot be performed
    D.
    All of the above
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. The concept of a general CAD system was that it should provide:

  16. A.
    A system for handling user actions.
    B.
    A system for the operation of applications programming.
    C.
    A set of basic system functions and utilities.
    D.
    All of the above
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. The insect type robot Attila is a more competent version of the robot Genghis an weights 1.7 kg. What is the number of microprocessors carried by its body?

  18. A.
    15
    B.
    10
    C.
    33
    D.
    15
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. The "walk-through" method of programming a robot involves:

  20. A.
    walking through your suggested procedure with your supervisor prior to programming
    B.
    physically moving the robot through all the motions it is to repeat
    C.
    moving the robot from one location to another
    D.
    All of the above.
    E.
    None of the above

    View Answer

    Workspace

    Discuss Discuss in Forum