EEE :: Economics of Power Generation
- Which of the following is the essential requirement of peak load plant?
- In an interconnected system, the diversity factor of the whole system
- Maximum demand on a power plant is
- Which of the following are not repayable after a stipulated period ?
- For any type of consumer the ideal tariff is
- Which of the following is not an operating cost ?
- Can generate power at unpredictable or uncontrolled times,