  1. A tank of internal dimension 3 m x 5 m x 4 m (Length x Breadth x Height) has 200 mm thick brick wall on all sides. Volume of brickwork in m3 would be _______.
  2. A.
    13 to 14
    B.
    14 to 15
    C.
    15 to 16
    D.
    16 to 17

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. Flux emitted from a 1cd light source in all directions, in lumens, would be _______.
  4. A.
    10 to 11
    B.
    21 to 22
    C.
    12 to 13
    D.
    43 to 44

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. 50 Hectare of residential sector has 65% buildable area. The FAR of the buildable area is 1.5. Within the residential sector, 60% of dwelling units are of area 100 m2 each and 40% of the dwelling units are of area 80 m2 each. 
    The gross residential density, in dwelling units per Hectare, would be _______.
  6. A.
    104
    B.
    105
    C.
    106
    D.
    107

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. In the given project network diagram, the total slack for job A in days would be _______.

  8. A.
    1
    B.
    2
    C.
    3
    D.
    4

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. The scale of a contour map is 1:10,000 and the contour interval is 5 m. Distance between two given points on the map is 2 cm and the elevation difference between the two given points is 10 m. The actual distance between the two given points in m would be
  10. A.
    2
    B.
    20
    C.
    200
    D.
    2000

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. The scale of a contour map is 1:10,000 and the contour interval is 5 m. Distance between two given points on the map is 2 cm and the elevation difference between the two given points is 10 m.
    The slope between two given points in percentage is
  12. A.
    5
    B.
    10
    C.
    15
    D.
    20

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. Cost of a new building is Rs 10,00,000 and its scrap value after 50 years is Rs. 1,00,000. Using straight line method 
    The annual depreciation of the building in Rs. would be
  14. A.
    10,000
    B.
    15,000
    C.
    18,000
    D.
    20,000

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Cost of a new building is Rs 10,00,000 and its scrap value after 50 years is Rs. 1,00,000. Using straight line method 
    The book value after 10 years in Rs. would be
  16. A.
    1,80,000
    B.
    3,60,000
    C.
    6,00,000
    D.
    8,20,000

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. A room of size 100 m2 is illuminated by 10 lamps of 40 W having a luminous efficacy of 50 lm/W. 
    Total flux emitted by the lamps in lumens would be
  18. A.
    2,000
    B.
    5,000
    C.
    10,000
    D.
    20,000

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. A room of size 100 m2 is illuminated by 10 lamps of 40 W having a luminous efficacy of 50 lm/W. 
    If utilization factor is 0.5, at a working height of 90 cm above the floor level, the illumination in lux would be
  20. A.
    100
    B.
    200
    C.
    500
    D.
    1000

    View Answer

    Workspace

    Discuss Discuss in Forum