Home / Mechanical Engineering / Heat Transfer,Refrigeration and Air Conditioning :: Discussion

Discussion :: Heat Transfer,Refrigeration and Air Conditioning

  1. The conditioned air supplied to the room must have the capacity to take up

  2. A.
    room sensible heat load only
    B.
    room latent heat load only
    C.
    both room sensible heat and latent heat loads
    D.
    none of the above

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question.


Be The First To Comment