Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: Discussion

Discussion :: Industrial Engineering and Prod'n Mgmt

  1. Choose the wrong statement Time study is used to

  2. A.

     Determine overhead expenses

    B.

     Provide a basis for setting piece prices or incentive wages

    C.

     Determine standard costs

    D.

     Determine the capability of an operator to handle the number of machines

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    Time study is a structured process of directly observing and measuring human work using a timing device to establish the time required for completion of the work by a qualified worker when working at a defined level of performance.


Be The First To Comment