Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: Discussion

Discussion :: Industrial Engineering and Prod'n Mgmt

  1. Time study is used to

  2. A.

     Determine standard costs

    B.

     Determine the number of machines a person may run

    C.

     Provide a basis for setting piece price or incentive wages

    D.

     All of the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Time study is a structured process of directly observing and measuring human work using a timing device to establish the time required for completion of the work by a qualified worker when working at a defined level of performance.


Be The First To Comment