  1. P.M.T.S. (Predetermined Motion Time Systems) include

  2. A.

     M.T.M. (Method Time Measurement)

    B.

     W.F.S. (Work Factor Systems)

    C.

     B.M.T.S. (Basic Motion Time Study)

    D.

     All of these

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    A predetermined motion time system (PMTS) is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor (labour) oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions.