Discussion :: Industrial Engineering and Prod'n Mgmt
- P.M.T.S. (Predetermined Motion Time Systems) include
A.
M.T.M. (Method Time Measurement) |
B.
W.F.S. (Work Factor Systems) |
C.
B.M.T.S. (Basic Motion Time Study) |
D.
All of these |
Answer : Option D
Explanation :
A predetermined motion time system (PMTS) is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor (labour) oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions.
Be The First To Comment