Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: Discussion

Discussion :: Industrial Engineering and Prod'n Mgmt

  1. PMTP (predetermined motion time systems) include

  2. A.

     MTM (method time measurement)

    B.

     WFS (work factor systems)

    C.

     BNTS (basic motion time study)

    D.

     All of the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    PMTP (predetermined motion time systems) include
    - MTM (method time measurement)
    -WFS (work factor systems)
    - BNTS (basic motion time study)


Be The First To Comment