- Standard time is equal to
A.
(Normal time) - (allowances) |
B.
(Normal time) + (allowances) |
C.
Representative time multiplied by rating factor |
D.
Normal time taken by an operation |
Answer : Option B
Explanation :
Standard time is equal to (Normal time) + (allowances)
the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method.