  1. Performance rating is equal to

  2. A.

     Observed performance + normal performance

    B.

     Observed performance - normal performance

    C.

     Observed performance × normal performance

    D.

     None of the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Performance Rating can be defined as the procedure in which the time study engineer compares the performance of operator(s) under observation to the Normal Performance and determines a factor called Rating Factor.