Home / Mechanical Engineering / Industrial Engineering and Production Management :: Discussion

Discussion :: Industrial Engineering and Production Management

  1. P.M.T.S. (Predetermined Motion Time Systems) include

  2. A.
    M.T.M. (Method Time Measurement)
    B.
    W.F.S. (Work Factor Systems)
    C.
    B.M.T.S. (Basic Motion Time Study)
    D.
    all of these

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.


Be The First To Comment