Civil Engineering :: Building Construction
- The lower half portion between crown and skew back of the arch, is called
- A floor constructed with 3 mm marble chips, is known
- A floor constructed with the 4 to 6 mm marble chips, is known
- As compared to English bond, double Flemish bond is
- In case of Raymond pile
- The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called
- If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
- The arrangement of supporting an existing structure by providing supports underneath, is known as
- While designing a stair, the product of rise and going is approximately kept equal to