To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as
-
The concrete slump recommended for foundations, is
-
The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is
-
The form work from the slabs excluding props, can be removed only after
-
The pile provided with one or more bulles in its vertical shaft, is generally known as
-
To construct a 10 cm thick partition wall, you will prefer
-
The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
-
The vertical members fixed between steps and hand rail, are known