  1. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

  2. A.

     2.0 %

    B.

     2.5 %

    C.

     4.0 %

    D.

     5.0 %

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided