Civil Engineering :: Estimating and Costing
-
Pick up the excavation where measurements are made in square metres for payment.
-
The expected out turn of 2.5 cm cement concrete floor per manson per day
-
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
-
The correct prismoidal formula for volume is
-
The order of booking dimensions is
-
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
-
Pick up the item of work not included in the plinth area estimate
-
Pick up the correct statement from the following:
-
The brick work is measured in sq metre, in case of
-
Brick walls are measured in sq. m if the thickness of the wall is
A.
D [first area + last area + ∑ Even area + 2 ∑ odd areas] |
B.
\( \frac { D } { 3} \) [first area + last area + 4 ∑ Even area + 2 ∑ odd areas] |
C.
\( \frac { D } { 3} \)[first area + last area + 2 ∑ Even area + 4 ∑ odd areas] |
D.
\( \frac { D } {6} \)[first area + last area + 2 ∑ Even area + 4 ∑ odd areas]. |