Home / Civil Engineering / Estimating and Costing :: Section 1

Civil Engineering :: Estimating and Costing

  1. The detention period in a septic tank is assumed

  2. A.

    20 minutes

    B.

    25 minutes

    C.

    30 minutes

    D.

    40 minutes

    View Answer

    Workspace

    Discuss Discuss in Forum