Home / Civil Engineering / Estimating and Costing :: Section 1

Civil Engineering :: Estimating and Costing

  1. Pick up the correct statement in case of water supply.

  2. A.

    Pipes laid in trenches and pipes fixed to walls are measured separately

    B.

    Cutting through walls and floors are included with the item

    C.

    Pipes are classified according to their sizes and quality

    D.

    In laying pipes, the method of jointing and fixing is specifically specified

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  3.  

    In case of laying gullies, siphons, intercepting traps, the cost includes

  4. A.

    Setting and laying

    B.

    Bed concreting

    C.

    Connection to drains

    D.

    All of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

  6. A.

    breadth of the wall

    B.

    half breadth of wall on each side

    C.

    one fourth breadth of wall on each side

    D.

    None of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. The height of the sink of wash basin above floor level is kept

  8. A.

    60 cm

    B.

    70 cm

    C.

    75 cm to 80 cm

    D.

    80 cm

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. While preparing a detailed estimate

  10. A.

    Dimension should be measured correct to 0.01 m

    B.

    Area should be measured correct to 0.01 sqm

    C.

    Volume should be measured correct to O.Olcum

    D.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. Pick up the incorrect statement regarding a master trap from the following :

  12. A.

    It is provided in between the lower end of the house drain and the street sewer

    B.

    It is provided a cleaning eye at the top of the trap

    C.

    The height of fresh air inlet pipe fixed vertically with wall is 3 m

    D.

    The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe

    E.

    The water seal is less than that of ordinary traps.

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. The concrete work for the following part of the building of specified thickness is measured in square metres

  14. A.

    Root slabs

    B.

    Floors

    C.

    D.P.C.

    D.

    Wall panels

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Pick up the correct statement from the following:

  16. A.

    The estimated value of the work excluding the amount for contigencies, work charged establishment, tool and plants, is called work value

    B.

    The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost

    C.

    The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval

    D.

    The order of a competent authority sanctioning a properly detailed estimate of the cost of a work of construction or repair is called technical sanction

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

  18. A.

    1.5 m3

    B.

    2.5 m3

    C.

    3.5 m3

    D.

    5.0 m3

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. The area of the cross-section of a road fully in banking shown in the given figure, is

  20. A.

    \(\frac { sb^2+r^2(2bd+sd)^2 } { r^-s^2 } \)

    B.

    \(\frac { sb^2+r^2(2bd+sd)^2 } { r^2-s^5 } \)

    C.

    \(\frac { sb^2+r^2(2bd+sd)^2 } { r-s } \)

    D.

    none of these