Civil Engineering :: Estimating and Costing
-
The area of the cross-section of a road fully in banking shown in the given figure, is
-
The plinth area of a building not includes
-
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
-
The item of the brick structure measured in sq.m, is
-
The inspection pit or chamber is a manhole provided in a base drainage system
-
In the mid-section formula
-
The item of steel work which is measured in sq.m, is
-
The value of 'C' of Indian type W.C. shown in the given figure is :
-
The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
A.
The mean depth is the average of depths of two consecutive sections |
|
B.
The area of mid-sections is calculated by using mean depth |
|
C.
The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two sections |
|
D.
The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections |
|
E.
|