Home / Civil Engineering / Estimating and Costing :: Discussion

Discussion :: Estimating and Costing

  1. Pick up the excavation where measurements are made in square metres for payment.

  2. A.

    Ordinary cuttings up to 1 m

    B.

    surface dressing up to 15 cm depths

    C.

    Surface excavation up to 30 cm depths

    D.

    Both (b) and (c)

    E.
    Both (a) and (b)

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.


Be The First To Comment