Home / Civil Engineering / Estimating and Costing :: Discussion

Discussion :: Estimating and Costing

  1. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

  2. A.

    Excavation

    B.

    Surface dressing

    C.

    Cutting

    D.

    Surface excavation.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.


Be The First To Comment