Civil Engineering :: Highway Engineering
- In highway construction, rolling starts from
- The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as
- Centre line markings are used
- The method of design of flexible pavement as recommended by IRC is
- In the penetration macadam construction, the bitumen is
- Select the correct statement.
- The direct interchange ramp involves
- Maximum daily traffic capacity of bituminous pavements is
- The maximum number of vehicles beyond which the rotary may not function efficiently is
A.
Nagpur road plan formula take into account the towns with very large population. |
B.
Nagpur road plan has a target road length of 32 km per 100 square km. |
C.
Second 20-year plan has provided 1600 km of expressways out of the proposed National highway. |
D.
Second 20-year plan allowed deduction of length of railway track in the area while calculating the length of roads. |