Civil Engineering :: Tunneling
-
High pressure grouting is generally restored for concreting in the lining if the rock strata is:
-
For hauling muck from the tunnel, the following type of muck-car is used :
-
Which one of the following methods is adopted for permanent drainage of tunnels :