Home / Civil Engineering / Tunneling :: Section 1

Civil Engineering :: Tunneling

  1. High pressure grouting is generally restored for concreting in the lining if the rock strata is:

  2. A.
    highly fissured
    B.
    poor
    C.
    likely to get seepage of water
    D.
    All of the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. For hauling muck from the tunnel, the following type of muck-car is used :

  4. A.
    muck box
    B.
    balle-ship
    C.
    side dump car
    D.
    U-bottom
    E.
    All of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Which one of the following methods is adopted for permanent drainage of tunnels :

  6. A.
    provision of longitudinal drains
    B.
    continuous open drains
    C.
    concrete lining
    D.
    grouting with cement or chemicals
    E.
    All the above.

    View Answer

    Workspace