Home / Civil Engineering / Tunneling :: Section 1

Civil Engineering :: Tunneling

  1. Which one of the following statements is not correct in respect of setting of an inclined tunnel:

  2. A.
    Reference points are constructed at every 300 m.
    B.
    The alignment is fixed from upper/lower apex point.
    C.
    The level of the invert at the heading is marked by a tape.
    D.
    Reference points are constructed on the roof of tunnels
    E.
    None the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. Forepoling method is generally adopted for tunnelling in :

  4. A.
    soft ground
    B.
    firm ground
    C.
    running ground
    D.
    None of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Concrete lining is provided concurrently with the driving operation in case of

  6. A.
    rock terrain
    B.
    soft rock
    C.
    running soil
    D.
    none of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than

  8. A.
    200 particles/cm3
    B.
    250 particles/cm3
    C.
    300 particles/cm3
    D.
    450 particles/cm3
    E.
    400 particles/cm3

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. Which one of the following statements is not correct with regard to heading and hench-ing method of tunnelling.

  10. A.
    Driving of tunnel is done in two portions of its section
    B.
    Driving the top portion is done in advance of the bottom portion.
    C.
    After driving the top portion 3 m to 3.5 m holes are drilled into the head and bench.
    D.
    The holes in head and bench are loaded together with explosive for blasting.
    E.
    Firing of head holes is done just before the bench holes are fired.

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. Which one of the following methods is generally used for the layout of the muck-car tracks

  12. A.
    the grass hopper method
    B.
    passing track method
    C.
    the cherry picker
    D.
    California crossing, Dixon conveyor
    E.
    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. For transferring the tunnel alignment through shafts, we adopt the following steps :
    1. Hanging two or more plumb lines in the shaft
    2. Determining the bearing of the plumb lines i.e. plumb plane
    3. Suspending a 35 kg weight by each plumb line
    4. Immersing the weights of both the plumb lines in the buckets containing water.
    The correct sequence of steps is :

  14. A.
    1 2 3 4
    B.
    4 3 2 1
    C.
    l 3 2 4
    D.
    2 1 4 3

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. For initial surveys of tunnels, the following activities are involved:
    1. Marking portal point with concrete pillars on the ground
    2. Marking tunnel obligatory points on the topographical maps
    3. Preliminary setting of the tunnel on the topographical Survey of India maps
    3. Driving lines between the fixed obligatory points.
    The correct sequence of the activities is :

  16. A.
    3 2 4 1
    B.
    1 2 3 4
    C.
    4 3 1 2
    D.
    2 4 3 1

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. For full face method, the excavation to be done is generally divided into

  18. A.
    two sections
    B.
    three sections
    C.
    four sections
    D.
    five sections.

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. The tunnels, the artificial underground passages are constructed for :

  20. A.
    highways
    B.
    railways
    C.
    sewerage
    D.
    water supply project
    E.
    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum