CSE MCQs :: STLC
- When an expected result is not specified in test case template then ___________
- In white box testing what do you verify?
- End result of Software Requirement Analysis is ________
- The inputs for developing a test plan are taken from
- Testing beyond normal operational capacity is __________
- The name of the testing which is done to make sure the existing features are not affected by new changes
- Which of the following is NOT a static testing technique?
- A Plan to overcome the risk called as
- Verification is:
- During which test activity could faults be found most cost effectively?