Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt
- The difference between the time available to do the job and the time required to do the job, is known as
- In A-B-C analysis, which class of items are generally large in number?
- Which one of the following chart gives simultaneously information about the progress of work and machine loading?
- The important file in making a PERT is
- Which of the following layouts is suited for mass production?
- A dummy activity in a net work diagram
- An activity of the project is graphically represented by ________ on the network diagram.
- Which of the following are the guidelines for the construction of a network diagram?
- Which of the following statement is correct about the network diagram?
- Valve analysis is particularly of interest when