Civil Engineering :: Building Construction
- The type of roof suitable in plains where rainfall is meagre and temperature is high is
- During percussion drilling
- The X-ray rooms are plastered with
- The process of making the back ground rough, before plastering, is
- In case of multi-storeyed buildings, the forms to be removed first are
- A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to
- The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as
- The arrangement made to support an unsafe structure temporarily, is known as
- The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is