- Pick up the correct statement from the following:
- Pick up the incorrect statement from the following:
- Pick up the consideration to the taken while designing a hospital from the following:
- Pick up the correct statement from the following:
- Pick up the incorrect statement from the following:
- Pick up the correct statement from the following:
- Pick up the correct statement from the following:
- Pick up the commonly adopted geophysical method in civil engineering from the following:
- Pick up the correct statement about silt soil from the following:
- Pick up the incorrect statement from the following:
A.
The retaining wall should be structurally capable to resist the applied earth pressure |
B.
The section of the retaining wall should be so proportioned that it may not overturn by the lateral pressure |
C.
The retaining wall should be safe against sliding |
D.
To drain off water from the earth retained, weep holes are provided near the top of the retaining wall |
A.
The roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads |
B.
The beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns |
C.
The slab is spanned across the secondary beams provided between the main beams |
D.
All of these |
A.
The width of the wall is constructed thicker at the base in a stepped fashion |
B.
A long vertical load transferring concrete structure is called a concrete pile |
C.
In pile which transfers the load to the soil by the friction between the pile and the surrounding soil is called friction pile |
D.
The pile which transfers the load to a hard rock bed at certain depth is called load bearing |