  1. Rotary drilling is the fastest method in case of

  2. A.

     Rocky soils

    B.

     Clay soils

    C.

     Sandy soil

    D.

     All of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as

  4. A.

     Troweling

    B.

     Laying

    C.

     Grouting

    D.

     Placing

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. The function of cleats in a roof truss is

  6. A.

     To support the common rafter

    B.

     To support purlins

    C.

     To prevent the purlins from tilting

    D.

     All of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. The under surface of an arch, is called

  8. A.

     Soffit

    B.

     Intrados

    C.

     Haunch

    D.

     Back

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. The minimum depth of foundation in clayey soils is

  10. A.

     0.5 m

    B.

     0.7 m

    C.

     0.9 m

    D.

     1.2 m

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. The range of spread from the wall base to outer edge of a brick work foundation does not exceed

  12. A.

     1/2 horizontal to 1 vertical

    B.

     2/3 horizontal to 1 vertical

    C.

     1 horizontal to 1 vertical

    D.

     2 horizontals to 1 vertical

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed

  14. A.

     5 m

    B.

     10 m

    C.

     15 m

    D.

     20 m

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. For a wall carrying heavy load on low bearing capacity soil,

  16. A.

     Lean concrete bed is provided

    B.

     Thick concrete bed is provided

    C.

     Reinforced concrete bed is provided

    D.

     Both (A) and (C) of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. The process of working a flat for the finishing coat, is known

  18. A.

     Dubbing out

    B.

     Floating

    C.

     Knitting

    D.

     Blistering

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. In flat roof of reinforced cement concrete, the recommended angle of slope, is

  20. A.

     Zero

    B.

     A few degrees

    C.

     10°

    D.

     200°

    View Answer

    Workspace

    Discuss Discuss in Forum