Home / Civil Engineering / Estimating and Costing :: Section 2

Civil Engineering :: Estimating and Costing

  1. The cross-sectional area of the embankment of a canal fully in embankment in the given figure is

  2. A.

    \(\frac { 1 } { 2 } \) (b1+b2)h

    B.

    (b1+b2)h+sb2

    C.

    (b₁ + b₂) + 2sh⊃2;

    D.

    2( [b₁ + b₂)(b+sh2]


  3. The value of 'B' of Indian type W.C. shown in the given figure is :

  4. A.

    45 cm

    B.

    50 cm

    C.

    30 cm

    D.

    25 cm


  5. The rate of an item of work depends on

  6. A.

    Specifications of works

    B.

    Specifications of materials

    C.

    Proportion of morta

    D.

    Method of construction

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. Pick up the correct statement from the following:

  8. A.

    All pipes and fittings are classified according to their diameters

    B.

    The diameter of the pipes is the nominal diameter of internal bore

    C.

    All pipes are measured along the centre line of the pipes in metres

    D.

    Lead caulked joints are enumerated separately

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum