Which one of the following statements is not correct for heading and benching method of tunnelling ?
-
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
-
In case of drift method of tunnelling, the drift may be excavated at
-
A tunnel is found more advantageous as compared to the alternate routes because it:
-
For B.G. single track railway, the height of the tunnel above top of rails should be
-
Pick up the correct statement regarding drilling a tunnel from the following:
-
For tunnels exceeding 300 m in length, the grade should be provided below
-
The method of draining in the tunnels, is generally known as
-
Pick up the correct statement from the following during tunnel excavation,
-
To attain the required shape of the tunnel section, we use :