Home / CSE MCQs / SAP PP ::

CSE MCQs :: SAP PP

  1. List out the activities carried out in Production Planning?
  2. A.
    Processing material master
    B.
    Creation of Bill of Material
    C.
    Displaying work center and routing
    D.
    All of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. Which SAP NetWeaver component realizes cross-system application processes?
  4. A.
    SAP Business Warehouse (SAP BW)
    B.
    SAP Enterprise Portal (SAP EP)
    C.
    SAP Master Data Management (SAP MDM)
    D.
    SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. The Individual / Collective indicator in the material Master determines
  6. A.
    Whether a component is procured for a special customer requirement in the individual segment
    B.
    Requirement quantities of dependent materials are grouped together during MRP run
    C.
    The Material Requirement Planning
    D.
    The Special Procurement

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. Movement type for goods receipt into warehouse
  8. A.
    122
    B.
    123
    C.
    101
    D.
    102

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. What is the T Code for changing planned order?
  10. A.
    MD11
    B.
    MD12
    C.
    MD13
    D.
    MD14

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. When scheduling a routing in the SAP ECC system, which of the following time elements is a interoperation time?
  12. A.
    Safety time
    B.
    Float before production
    C.
    Processing time
    D.
    Setup time

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. What is the use of BOM?
  14. A.
    MRP
    B.
    Costing
    C.
    Inspection data
    D.
    Sales and Distribution
    E.
    All of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. As a production manager, how do you enable process operations parallel to and independent of other operations?
  16. A.
    Parallel sequences
    B.
    Successor relationships
    C.
    Control sequences
    D.
    Linked sequences

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. Consumption-based planning is usually used for following materials
  18. A.
    All A & B Class Materials
    B.
    Materials with smooth consumption pattern
    C.
    Both a and b
    D.
    None

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. Consider a product scenario where there is high product stability, high repetition rates, and low product complexity. What type of manufacturing do you suggest?
  20. A.
    Mass manufacturing
    B.
    Bulk manufacturing
    C.
    Repetitive manufacturing
    D.
    Order based manufacturing

    View Answer

    Workspace

    Discuss Discuss in Forum