Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt
- Dispatching
- Material handling in automobile industry is done by
- Time study is carried out
- Work study is most useful
- In the cost structure of a product, the selling price is determined by the factors such as
- Replacement studies are made on the following basis
- Simplex method is the method used for
- The main disadvantage of line organisation is
- A systematic job improvement sequence will consist of
- The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
A.
By finding all the significant informations regarding the job, work place and machine tool etc |
B.
By breaking up each operation into small elements which are measurable with the help of the measuring device accurately |
C.
By observing and recording the time taken by the operator for an operation |
D.
All of the above |