Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt
- The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
- Expediting function consists in keeping a watch on
- Travel charts provide
- Inventory management consists of
- Which of the following statement is correct?
- Which of the following statement is correct?
- In the perpetual inventory control, the material is checked when it reaches its
- Basic motion time study gives times for basic motions in ten thousandths of
- Pick up the correct statement about relationship between various floats
- The aim of value engineering is to
A.
An idea of the flow of materials at various stages |
B.
A compact estimate of the handling which must be done between various work sections |
C.
The information for changes required in rearranging material handling equipment |
D.
An approximate estimate of the handling which must be done at a particular station |