Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: section-1

Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt

  1. Time study is

  2. A.

     The appraisal, in terms of time, of the value of work involving human effort

    B.

     Machine setting time

    C.

     Time taken by workers to do a job

    D.

     Method of fixing time for workers

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. The chart which gives an estimate about the amount of materials handling between various work stations is known as

  4. A.

     Flow chart

    B.

     Process chart

    C.

     Travel chart

    D.

     Operation chart

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. One of the basic essentials of an incentive plan is that

  6. A.

     A differential piece rate system should exist

    B.

     Minimum wages should be guaranteed

    C.

     Provide incentive to group efficiency performance

    D.

     All standards should be based on time studies

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. Standard time as compared to normal time is

  8. A.

     Greater

    B.

     Smaller

    C.

     Equal

    D.

     There is no such correlation

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. The correct sequence of phases in value engineering is

  10. A.

     Creative phase, information phase, investigation phase, evaluation phase

    B.

     Information phase, creative phase, investigation phase, evaluation phase

    C.

     Investigation phase, information phase, creative phase, evaluation phase

    D.

     Creative phase, investigation phase, evaluation phase, information phase

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. The reasons which are basically responsible for the formation of a queue should be that

  12. A.

     The average service rate Hess than the average arrival rate

    B.

     Output rate is linearly proportional to input

    C.

     Output rate is constant and the input varies in a random manner

    D.

     All of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. For ship vessel industry the following layout is best suited

  14. A.

     Process layout

    B.

     Product layout

    C.

     Fixed position layout

    D.

     Plant layout

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Breakeven analysis is a

  16. A.

     Short term analysis

    B.

     Long term analysis

    C.

     Average of short and long term analysis

    D.

     Any one of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. The deductions for, employees provident fund start

  18. A.

     Immediately on joining the service

    B.

     After 60 days of joining the service

    C.

     After 100 days of joining the service

    D.

     After 240 days of joining the service

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. PERT/CPM, techniques can be used for following applications

  20. A.

     Once through project

    B.

     Maintenance jobs

    C.

     Research and development

    D.

     All of the above

    View Answer

    Workspace

    Discuss Discuss in Forum