Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt
- Job enrichment technique is applied to
- A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called
- In inventory control, the economic order quantity is the
- If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be
- If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
- In crash program for a project
- Graphical method, simplex method, and transportation method are concerned with
- Emergency rush order can be pushed more effectively in
- TMU in method time measurement stands for
- Slack represents the difference between the