  1. Linear programming can be applied successfully to

  2. A.
    chemical industry
    B.
    oil industry
    C.
    banks
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. For handling materials during manufacture of cement, a __________ is widely used.

  4. A.
    belt conveyor
    B.
    bucket conveyor
    C.
    fork lift truck
    D.
    overhead crane

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Process layout is also known as

  6. A.
    analyticallayout
    B.
    synthetic layout
    C.
    static product layout
    D.
    none of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. PERT is a project planning and control technique.

  8. A.
    Yes
    B.
    No

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. The most suitableincentive plan for the maintenance section of an industry will be

  10. A.
    piece rate system
    B.
    group incentive plan
    C.
    profit sharing plans
    D.
    simplification

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by

  12. View Answer

    Workspace

    Discuss Discuss in Forum


  13. CPM requires

  14. A.
    single time estimate
    B.
    double time estimate
    C.
    triple time estimate
    D.
    none of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Halsey plan of wage incentive

  16. A.
    is not applied to all level of workers
    B.
    is applied to all level of workers
    C.
    does not guarantee minimum wage
    D.
    is based upon efficiency of worker

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. Which of the following wage incentive plan is applied to all workers?

  18. A.
    Halsey plan
    B.
    Gantt plan
    C.
    Emerson's efficiency plan
    D.
    Rowan plan

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. Actual performance of a task is called

  20. A.
    an event
    B.
    an activity
    C.
    a duration
    D.
    none of these

    View Answer

    Workspace

    Discuss Discuss in Forum