Mechanical Engineering :: Industrial Engineering and Production Management
-
The aim of value engineering is to
-
In time study, the rating factor is applied to determine
-
Gantt chart is used for
-
The main object of scientific layout is
-
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
-
In value engineering, the term value refers to
-
In inventory control theory, the economic order quantity is
-
Production cost refers to prime cost plus
-
A systematic job improvement sequence will consist of
-
Work sampling is applied for