Mechanical Engineering :: Industrial Engineering and Production Management
-
Sampling method of determining standard time is profitable for long cycle operation.
-
Break even analysis is a
-
In a functional organisation
-
The purpose of micromotion study is to
-
A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
-
Scheduling
-
F. W. Taylor introduced a system of organisation known as
-
The correct sequence of phases in value engineering is
-
Micromotion study is
A.
creative phase, information phase, investigation phase, evaluation phase
|
B.
information phase, creative phase, investigation phase, evaluation phase
|
C.
investigation phase, information phase, creative phase, evaluation phase
|
D.
creative phase, investigation phase, evaluation phase, information phase
|