Home / Mechanical Engineering / Industrial Engineering and Production Management :: Section 2

Mechanical Engineering :: Industrial Engineering and Production Management

  1. The factors to be considered for production scheduling are

  2. A.
    component design
    B.
    route sheet
    C.
    time standards
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  3. Product layout is best suited where

  4. A.
    one type of product is produced
    B.
    product is standardised
    C.
    product is manufactured in large quantities
    D.
    all of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Break even analysis consists of

  6. A.
    fixed expenses
    B.
    variable cost
    C.
    sales revenue
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  7. Line organisation is suitable for

  8. A.
    sugar industries
    B.
    oil refining industries
    C.
    spinning and weaving industries
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  9. Slack represents the difference between the

  10. A.
    earliest completion time and latest allowable time
    B.
    latest allowable time and earliest completion time
    C.
    earliest completion time and normal expected time
    D.
    latest allowable time and normal allowable time

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. Acceptance sampling is used in

  12. A.
    job production
    B.
    batch production
    C.
    mass production
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. Queuing theory is used for

  14. A.
    job-shop scheduling
    B.
    inventory problems
    C.
    traffic congestion studies
    D.
    all of these

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Which of the following statement is correct?

  16. A.
    When slack of an activity is zero, it falls only on critical path.
    B.
    CPM technique is useful to minimise the direct and indirect expenses.
    C.
    Critical path of a net work represents the minimum time required for completion of project.
    D.
    all of the above

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. Break even point is the point where

  18. A.
    fixed and variable cost lines intersect
    B.
    fixed and total cost lines intersect
    C.
    variable and total cost lines intersect
    D.
    sales revenue and total expensive lines intersect

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a

  20. A.
    belt conveyor
    B.
    bucket conveyor
    C.
    fork lift truck
    D.
    overhead crane

    View Answer

    Workspace

    Discuss Discuss in Forum