Civil Engineering :: Construction Planning and Mgmt
- Time and progress chart of a construction, is also known as
- The difference between the time avail-to do a job and the time required to do the job, is known as
- The Overall in-charge of an organization at the site responsible for the execution of the works, is
- For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
- Various activities of a project, are shown on bar charts by
- The main disadvantage of line organization, is
- The main principle of an organization, is
- A critical ratio scheduling
- A golden rule for the procurement of construction stones, suggests
- If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is