Civil Engineering :: Construction Planning and Mgmt
-
Consider the following operations:
1. Drilling
2. Blasting
3. Mucking
4. Placing steel
5. Placing concrete
The correct sequence of these operations in tunnel construction is - The salient feature of functional organization is
- The time corresponding to minimum total project cost is
- The process of incorporating changes and rescheduling or replanning is called
- If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and latest finish time, then the following relation holds good
- The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as
- The independent float affects only
- PERT analysis is based on
- Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
- A CPM family includes
A.
The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time |
B.
The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time |
C.
Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity |
D.
All the above |