Civil Engineering :: Estimating and Costing
-
The area of the cross-section of a road fully in banking shown in the given figure, is
- A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
- The concrete work for the following part of the building of specified thickness is measured in square meters
- The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
- The expected out turn of half brick partition wall per mason per day is
- The measurement is made in square metre in case of
- The measurement is made for stone work in square metre in case of
- As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
- Pick up the correct statement in case of water supply.
-
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is