Civil Engineering :: Estimating and Costing
- The brick work is measured in sq metre, in case of
- According to Indian Standards Institute, the actual size of modular bricks is
- The brick work is not measured in cu m in case of
- Berms are provided in canals if these are
- While estimating a reinforced cement structure, the omitted cover of concrete is assumed
- Pick up the item of work not included in the plinth area estimate
- The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is
- Pick up the correct statement from the following:
- Pick up the correct statement from the following:
- Pick up the incorrect statement from the following: